Transit Projects Pty

Bronze member in categories Equipment provider, Service provider, Forest owner / harvester, Other
Transit Projects Pty company banner

 

TRANSIT PROJECTS PTY would like to introduce a Biomass Harvester for Forestry residues, Woody Weeds & SRC (short rotation crops).

The BIOBALERTM  Harvesting System cuts and compacts targeted biomass into a dense 4 foot round bale in a single pass.

Unique advantages with this include;

  • A one tractor operation,
  • cuts vegetal and woody biomass up to 5 inches dia,
  • 500kg compacted Bales transport Biomass cheaper,
  • Natural moisture reduction from 55% down to 20% is done before processing,
  • Biomass can be stored med-long term for efficient Bioenergy feedstock as demand requires,
  • Greater than 1MW of Energy in each uniform sized Bale,

Now there is a solution to the Collection of Woody Biomass – previously needing multiple large items of plant and extensive woodchip storage facilities, &

Transportation savings – transport twice as much Biomass or travel twice as far to an Energy prodtn facility.

**Consider the economic efficiencies the BIOBALERTM could bring to your current Biomass collection operation or a Project that was previously thought commercially unviable.**

BIOBALER HARVESTING SYSTEM – Available now in Australia and NZ.


Contact: Robert Gallagher
By email: transitprojects@live.com.au
By phone: +61 468 478 514

Company activities:
Biomass harvester, woody residue