Case Study: 1600kW and 2500kW biomass boilers for a commercial nursery (Zealandia Horticulture)

Zealandia Horticulture Ltd, Christchurch, New Zealand
a case study by Rob Mallinson of Living Energy, prepared with funding from EECA, June 2018

An examination of the deployment of two medium scale biomass boilers to heat a large horticulture facility, and the benefits delivered.

Contents:

  1. Backgroumd
  2. Business Case
  3. Equipment specifications
  4. What actually happened ?
  5. Risk analysis
  6. Summary
Sorry! This document can only be viewed by Bioenergy Association members.
Please log in to view it:

User login

To prevent automated spam submissions leave this field empty.